About the project

In connection with the conversion and new construction at MOWI’s Kvingo site, Alde Akva, engaged by Austevoll Rørteknikk, carried out the detailed design of the process piping. The units use flow-through technology with water reuse.

Images in this reference are courtesy of Mowi, by Børge Takvam.

Scope and deliverables

  • The project scope covers the conversion of the technical room in the existing first-feeding unit, a new hatchery and a new on-growing unit. Alde Akva was responsible for the detailed design, including sizing of process piping and equipment connections in all three units. Water quality in the tanks was also assessed, and Alde contributed to the design of tanks, fish boxes and drain sumps.
  • Alde Akva was also responsible for NS 9416 compliance in this project. This involves collecting, reviewing and producing critical documentation relating to escape prevention at the aquaculture facility.
  • Our other tasks included preparing the hydraulic profile for the outlet station and sizing the diffuser in line with the requirements of the County Governor (Statsforvalteren).
  • Specific deliverables include P&ID, PFD, a 3D model of the process piping, tender documentation for obtaining prices, technical evaluation of received bids and calculation of water quality in the tanks.

Structure