Blom Settefisk AS

About the project

As a supplier- and technology-neutral advisor, Alde Akva has acted as an advisory link between the project group at Blom Settefisk and the technical leads at other design and construction parties. In parallel, Alde Akva has assisted with obtaining and validating quotes, as well as procurement.

Alde Akva has been responsible for the pre-project, detailed design, project administration and follow-up during construction and commissioning of a new post-smolt unit at Blom Settefisk.

The project was carried out at an existing site connected to existing infrastructure, while the facility remained in operation throughout the project period.

Scope and deliverables

  • Two new Ø15 tanks for post-smolt production
  • Process plant based on flow-through with water reuse
  • Project administration and progress management
  • 3D modelling (BIM), including PFD and P&ID
  • Sizing of water, flow, oxygen, chemicals and effluent
  • Production planning with emphasis on fish welfare, biosecurity, fish health and economics
  • Working drawings for process piping and interdisciplinary interfaces
  • Risk assessments focused on escape prevention
  • As-built 3D model with tagging for traceability
  • Site follow-up, procurement and delivery control
  • Assistance with commissioning and follow-up in the operating phase (from October 2025)